O'day 192 Pages
Boyd Home Page
- O'Day 192 Home
- 2014 Work
- Sailing 2013
- 2012-2013 Work Season
- Sailing 2012
- Projects 2012
- Sailing 2011
- 2011/2012 Work Journal
- 2010/11 Work Journal
- Sailing 2010
- Projects 2010
- Checklists for trailering and sailing
- Raising the Mast

2012 -2013 Work Season

November 17, 2012

I winterized the boat today. I put some oil in the engine cylinder which takes about 5 minutes. The tools are under the engine cover. I checked the voltage on the battery - 12.42 volts - so I disconnected the negative cable and I was done with that. Next I swept the pine needles out of the cockpit, and I'm done. I love the simplicity of this boat.

I started working on the to do list:
- modify the rudder to lock up position
- get a set screw for the radio antena to replace the one I lost
- find the weather vane (brand new weather vane & I've lost it)

April 20, 2013

I've done none of this stuff. I'm adding to the list with the preperations for cruising the Erie Canal.
- create a mast cradle for the stern