O'day 192 Pages | |
Boyd Home Page - O'Day 192 Home - 2014 Work - Sailing 2013 - 2012-2013 Work Season - Sailing 2012 - Projects 2012 - Sailing 2011 - 2011/2012 Work Journal - 2010/11 Work Journal - Sailing 2010 - Projects 2010 - Checklists for trailering and sailing - Raising the Mast |
2012 -2013 Work SeasonNovember 17, 2012I winterized the boat today. I put some oil in the
engine cylinder which takes about 5 minutes. The tools are under
the engine cover. I checked the voltage on the battery - 12.42
volts - so I disconnected the negative cable and I was done with
that. Next I swept the pine needles out of the cockpit, and I'm
done.
I love the simplicity of this boat. April 20, 2013I've done none of this stuff. I'm adding to the list
with the preperations for cruising the Erie Canal. |